Technical & Financial Calculation Engines
Concrete Calculator
A 20 × 15 ft slab at 4 inches thick needs 3.70 cubic yards of concrete, so order 4.07 yards. Pick slab, wall or round pier, enter the size, and the calculator works out cubic yards and cubic feet, the number of 80, 60 and 50 lb bags, the truckloads and the cost of ready-mix versus bags.
- Cubic yards = length × width × thickness (all in feet) ÷ 27.
- One cubic yard takes 45 bags of 80 lb, 60 bags of 60 lb or 72 bags of 50 lb.
- Always order 10% extra for uneven ground and spillage.
- A 20 × 15 ft slab at 4 in needs 4.07 cubic yards to order.
- Ready-mix is usually cheaper than bags once the job passes about 1 cubic yard.
How this tool differs: This is the general concrete calculator: slab, wall and pier modes with bags, trucks and cost in one place. The other concrete pages do one job each — price comparison, formulas, square feet, yards only, triangles, bags only, footings or foundations.
Loading calculator…
Calculation Formula & Mathematical Engine
Theoretical equation governing this computation.
CuYd = \frac{L \times W \times T}{27}, \quad Order = Net \times (1 + Waste\%), \quad Bags_{80} = \frac{OrderCuFt}{0.6}Variable Definitions
Step-by-Step Calculation Example
Concrete for a 20 × 15 Ft Slab at 4 Inches Thick
- 1Net volume: 20 × 15 × (4 ÷ 12) = 100 cubic feet
- 2Cubic yards: 100 ÷ 27 = 3.70 cubic yards
- 3Order with 10% waste: 100 × 1.10 = 110 cubic feet, or 4.07 cubic yards
- 4Bags: 110 ÷ 0.6 = 183.3, so 184 bags of 80 lb (245 of 60 lb, 294 of 50 lb)
- 5Trucks: 4.07 ÷ 10 = 1 truckload
- 6Cost: ready-mix 4.07 × $150 = $611.11; bags 184 × $5.50 = $1,012.00 — ready-mix saves $400.89
How to work out how much concrete you need
Follow these steps to get your result.
- 1Pick the project type: slab, wall or round pier.
- 2Measure the length, width and thickness in feet and inches.
- 3Enter the size to get the net volume in cubic yards and cubic feet.
- 4Read the order volume with the 10% waste buffer, the bag count and the truckloads.
- 5Compare the ready-mix cost with the bag cost and order the cheaper one.
Comprehensive Practical Guide
In-depth analysis, domain guidelines, standard practices, and common pitfalls.
How Much Concrete Do I Need for a Slab?
Multiply length × width × thickness with all dimensions in feet, then divide by 27 to get cubic yards. A 20 × 15 ft slab at 4 inches is 100 cubic feet, or 3.70 cubic yards. One cubic yard covers 81 sq ft at 4 inches thick, 65 sq ft at 5 inches and 54 sq ft at 6 inches — so you can also work backwards from the area. Always add a 10% waste buffer before you order.
Bags or Ready-Mix: Which Is Cheaper?
Bags win on small jobs and trucks win on big ones. One cubic yard takes 45 bags of 80 lb, so a job under about 1 cubic yard is usually cheaper in bags — no delivery fee, no minimum load, and you mix only what you need. Above about 1 cubic yard the truck is almost always cheaper: the worked example above costs $611.11 by truck against $1,012.00 in bags. Watch for short-load fees on small ready-mix orders, usually under 2–3 cubic yards.
Why Order 10% Extra Concrete?
Three things use more concrete than the drawings say: uneven subgrade (the ground is never perfectly flat), spillage and form movement, and over-excavation where the digger went too deep. Ten percent covers normal formed work on compacted base; use 15% when pouring against rough excavation with no forms. Running short mid-pour is far worse than a small leftover — a cold joint between two pours is a weak line in the slab.
Frequently Asked Questions About Concrete Calculator
Direct, verified answers to common calculation and methodology questions.
Related Calculators
Explore complementary tools and related mathematical engines.
Concrete Calculator Price
Estimate total concrete costs comparing ready-mix delivery trucks vs pre-mixed retail bags, short-load fees, and pump rentals.
Concrete Calculator Square Feet
Calculate concrete cubic yards and bag requirements directly from total square footage and slab thickness.
Concrete Calculator Yards
Calculate ready-mix cubic yards, batch plant rounding rules, 8-10 yd³ truckload counts, and short-load surcharge alerts.